Hulme Regeneration Project
Hulme Regeneration Project, Manchester City Centre, included a park with a 1300 m2 paved area. Reclaimed granite sets were laid in a segmental arch pattern, interspersed with natural stone detailing.
Geo-Fix® Original was specified due to cost in use benefits and durability. The jointing was finished in just two and a half days - 20 times faster than originally planned saving £5.38 per m2 or £7,000 on the project.