Hulme Regeneration Project, Manchester City Centre, included a park with a 1300 m2 paved area. Reclaimed granite sets were laid in a segmental arch pattern, interspersed with natural stone detailing.

Geo-Fix® Original was specified due to cost in use benefits and durability. The jointing was finished in just two and a half days – 20 times faster than originally planned saving £5.38 per m2 or £7,000 on the project.


Other Developments

Speed and Ease – Wiltshire

Speed and Ease – Wiltshire

Inner City Regeneration

Speed and Ease – Wiltshire The paving area around the entrance to a new Sainsbury’s supermarket near Calne in Wiltshire urgently required jointing as the store was due to be opened within two weeks. The paving consisted of natural stone with clay cobbles laid as decorative feature work. Geo-Fix® Original to the rescue and, despite […]

Read More

Jerwood Space

Jerwood Space

Leisure

A former Victorian school in Southwark, the converted building was refurbished by Paxton Loucher Arhictects to create rehearsal studios, meeting rooms, offices and a versatile gallery space which is the home of the Jerwood Arts’ exhibition and events programme. Blue clay paviours were specified for both the internal and external paving having joint widths of […]

Read More

Prestigious Cumbrian Home

Prestigious Cumbrian Home

Impressive Development

Permanent Durable Finish! Porcelain paving was chosen for a large terraced area on a prestigious Cumbrian Home. Porcelain grout was not an option due to joint depth being less than 20mm additional cleaning and freezing temperatures. Wet mortar jointing material would cause mortar staining and be affected by weed and plant growth. Geo-Fix® All Weather […]

Read More